⚡️ WOW Black Friday! Enjoy our Lifetime Deal up to 30% OFF ⚡️
ProjectMummy
DiVision Studios
High

As a game designer, I would like to have a full game design document

16.00

Effort

2

Team Members

0 %

Completed

8

Tasks

Additional information

The Document should contain: -The story -Game environments and number of levels in each environment specified -Enemy Units -Weapons and other items the user will have. -Design for the game's Heads Up Display HUD, Menus, and menu navigation concept -Design for every Level in the game (top down) with enemy units and items that can be looted -The actor script set for all the game

Acceptance criteria

to have a full document that cam be presented to Oculus Marketplace